Blackwater Creek Trail

Building a section of trail near Langhorne Bridge

Several future eagle scouts building the footbridge

Bridge Complete

Blackwater Creek Trail

Spring 1989, Jeff worked directly with Ed Page to design and build a section of Blackwater Creek Trail, from Langhorne Rd upstream about 770' to and including the footbridge crossing. As of 2020, the bridge and trail has survived several major flood events

Footbridge completed 1989

Footbridge as of June 6th, 2020 (37.414669, -79.189633)