Blackwater Creek Trail
Building a section of trail near Langhorne Bridge
Several future eagle scouts building the footbridge
Bridge Complete
Blackwater Creek Trail
Blackwater Creek Trail
Spring 1989, Jeff worked directly with Ed Page to design and build a section of Blackwater Creek Trail, from Langhorne Rd upstream about 770' to and including the footbridge crossing. As of 2020, the bridge and trail has survived several major flood events
Footbridge completed 1989
Footbridge as of June 6th, 2020 (37.414669, -79.189633)